Period |
Clients /
Main Contractor
|
Project |
Decription |
2020
|
MTRC / Well Engineering Development Ltd |
Repair of External Louvre at Hung Hom Station |
Supply & Install Performance Weatherproof Louvre
(Proprietary Product)
|
2020
|
Gammom / ICGL Limted
|
Museum Plus (M+) of the West Kowloon Cultural District |
Installation of Precast Concrete Tube / Precast Elements & Structural sub-frame
|
2020
|
ALKF+ / China Oveasea
|
Proposed Property Development at West Rail Long Ping Station (South) Yuen Long Lot No. 512 (SOL City 朗城匯)
|
Supply & Install Aluminum Flood Board (Proprietary Product)
|
2020
|
Disneyland hong kong / Tong Kee Engineering Ltd
|
Disneyland hong kong (New Castle) |
Supply & Install Metal Railing & Gate
|
2019
|
Wheelock Properties (HK) |
NAPA, No 88 So Kwun Wat Road, Tuen Mun, NT |
Supply & Install Stainless Steel Grating Cover ; Aluminum Flood Board
|
2019 |
Leighton Gammon JV /
Permasteelisa Hong Kong
|
Contract 810A MTRC Express Rail Link
West Kowloon Terminus Station North |
Supply & Install Entrance Floor Mat
(Proprietary Product) |
2019 |
Henderson Land
Development Co. Ltd /
YMT Construction
Engineering Co. Ltd. |
B/F, G/F & 1/F at
No. 11-33 Li Tak Street, Tai Kok Tsui, Kln |
Supply & Install Shopfronts Glass
with supporting sub-frame and Alum Performance Louvre.
|
2019 |
Hong Kong Science Park Phase 3 / Tong Kee Engineering Ltd.
|
Science Park Phase 3, 12W /16W Building
|
Supply & Install Alum Cladding Wall & Canopy Alum Cladding
|
2019 |
Samsung Hsin Cheong JV / ICGL Limited |
SCL1109 Sung Wong Toi Station & To Kwa Wan Station |
Installation of Glass Balustrade, Stainless Steel Balustrade etc. |
2019 |
Samsung Hsin Cheong JV / ICGL Limited |
SCL1109 Sung Wong Toi Station & To Kwa Wan Station |
Installation of Aluminum Wall Panel |
2019 |
Courtyard Marrott, Shatin HK |
Courtyard Marrott Hotel , Shatin HK |
Renovation EVA driveway Grating |
2018 |
Leighton Gammon JV /
Permasteelisa Hong Kong Limited
|
Contract 810A MTRC Express Rail Link
West Kowloon Terminus Station North |
Supply & Install
Internal Aluminum Column Cladding |
2017
|
Highway Dept / China Habour Engineering Co. Ltd |
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities |
Stainless Steel Cat Ladder / Security Grille |
2017 |
Disneyland hong kong / Tong Kee Engineering Ltd |
Disneyland hong kong |
Maintenance - Balustrade; Gutter; Feature Cladding; Aluminum Window
|
2017 |
CLP / Full Wealth Construction
Limited |
400kV Electrical Substation, Tseung Kwan O |
Stainless Steel Fencing with Gates |
2017 |
New World Construction Company Limited / ICGL Technical Works
|
New World Centre - Palace Mall, 12A Sailsbury Road, Tsim Sha Shui, Proposed A&A Works of K.I.L 10978
|
Supply Aluminum RHS Fins for Decoration (with Wooden Color) Supply Only |
2017 |
Courtyard Marrott, Shatin HK |
Courtyard Marrott Hotel , Shatin HK |
Renovation EVA driveway Grating |
2016 |
Disneyland hong kong / Tong Kee Engineering Ltd
|
Disneyland hong kong
|
Maintenance - Balustrade; Gutter; Feature Cladding; Aluminum Window
|
2016 |
Highway Dept / Right Lead Construction Co. Ltd
|
Contract No. HY/2012/07 Tuen Mun - Chek Lap Kok Link Southern Connection Viaduct Section |
Supply Stainless Steel Pillar Box & GMS Pillar Box |
2016 |
New World Construction Company Limited / EFT-Craft Co. Ltd
|
New World Centre - Palace Mall, 12A Sailsbury Road, Tsim Sha Shui, Proposed A&A Works of K.I.L 10978 |
Stainless Steel Entrance Portals / Stainless Steel Balustrade |
2016 |
St. Paul's Hosptial
Tong Kee Engineering Ltd |
Demolish LED Sub-frame on Roof Floor, Reinstall Alum Wall Cladding and Alum Lourve |
Metal Work - Demolish & Repair |
2016 |
The Jockey Club / YMT Construction & Engineering Co. Ltd
|
New Olympic Stable Equine Pool at Sha Tin Racecourse LOT STT No.1638 |
Metal Work / Stainless Steel works
|
2016 |
Tigerwork |
No.66 Che Keng Tuk Road, Sai Kung |
Metal Work |
2015 |
Courtyard Marrott, Shatin HK |
Courtyard Marrott Hotel , Shatin HK |
Stainless Steel Bar Table / Renovation EVA driveway Grating |
2015 |
Wah Ming Engineering Asia Co, Ltd |
Proposed Residental at Tai Po Road, NKIL 6419, Kowloon |
Metal Steel Railing |
2014 |
Cargotec Asia Limited |
EPD West Kowloon Refuse Tranfer Station |
Crane GMS Staircase Modification |
2014 |
Gammon Construction Limited / Inka Limited |
#704 MTRC West Island Line - HKU & Sai Ying Pun Station |
Supply & Install Aluminum Flood Board (Proprietary Product
|
2014 |
Gammon Construction Limited / Inka Limited |
#705 MTRC West Island Line -
Kenndy Town Station / HKU Station |
Glass Balustrade / Architectural Metal Works |
2013 |
YMT Construction & Engineering Co. Ltd |
Proposed Commercial Development at
1L & 1M Sai Yeung Choi Street South, Mongkok, Kowloon
Lot No. KIL 7028 & 7029
|
Window Wall Panel / Cantilever Glass Canopy / Glass Balustrade / Signboard / Cat Ladder / FRP Fixed Glass / FRP Door
|
2012 |
Wise Trend Engineering Ltd |
Proposed New Building Lot No.57 in DD 175 and the Extension Thereto Hung Kiu Lane, Kau To
|
Supply & Install Window Wall / Glass Window / Stainless steel Balustrade |
2012 |
Hong Kong Tramways / POAD |
Renovation Advisting Panel at tram station |
Advisting Panel Works |
2012 |
Hanison Construction Holding Ltd / Million Hope Industries Ltd |
Proposed Shopping Centre - Discovery Bay North Development, Lantan Island
DD352 Lot 385 R.P and the Extension |
Supply & Install Structural frame ; Glass Wall Panel / Aluminum Cladding |
2011 |
ASD / Gammon Construction Ltd |
Tseung Kwan O Hosptial |
Supply & Install Metal Works / Balustade / Railing / Cat Ladder etc |